摘要: |
文章以广东省深圳市龙岗地铁三号线大运站周边绿化工程项目移栽胸径≥15 cm带全冠大树的工作经验,分析总结了反季节高温条件下(5、6月)大树移栽的技术措施。 |
关键词: 反季节〓全冠〓大树移栽〓绿化施工 |
DOI: |
分类号: |
基金项目:深圳市科技计划项目“园林大乔木免剪移植关键技术研究”(JSA200903190824A)。 |
|
The Technical Measures of Big Trees Transplanting with \=Full Crown in Couter season |
zhang yuesheng,Gao Jing and wu caiqiong
|
Longgang District Landscape Management of Shenzhen, Shenzhen Guangdong,,Shenzhen Techand Ecology
|
Abstract: |
In the high temperature conditions(May and June), greening project around Longgang Subway Line 3 Universiade station are completed through transplanting diameter ≥ 15 cm trees with full crown. This article analyzes and summarizes the technical measures in the process of transplanting. |
Key words: couter season, full crown, transplanting big trees, greening construction |